Cabin Update 2/14/12

Cabin Update 2/14/12

We have gotten several things done over the last week and weekend, but it still feels so slow. Mom and I finished the battens on the end of the house on Thursday, so finally that is done and can be stained. This past Saturday, it […]

Logs and 2 Windows on Front of Cabin

Logs and 2 Windows on Front of Cabin

Another Saturday with Brother-in-law extraordinaire and we accomplished more than we set out to do. The logs are all the way up and the two upstairs windows are in. 

Cabin Update 1/31/12- Kitchen Window and Trim

Cabin Update 1/31/12- Kitchen Window and Trim

Over the weekend, we were blessed to have a brother come to visit as well as a friend who comes regularly to lend some man power to this operation. We took advantage of the triple man power and we got a lot done. A couple […]

Making a Door

Making a Door

One thing we want to do while building this house, is use what we have, when we can, and refurbish great finds (or great deals) as much as we can. It is about saving money, but it is also a fun challenge. Sometimes it even […]

Cabin – 5 Months Into Construction – Part 3

Cabin – 5 Months Into Construction – Part 3

Once we had the eaves done, we treated all the wood with 2 layers of Timbor and then stained it all. We are using a neutral stain that we found at an overstock warehouse. It retails for over $30 per gallon, but they had it […]

Cabin – 5 Months Into Construction – part 2

Cabin – 5 Months Into Construction – part 2

This is the exterior within 2 weeks. The next week they finished the roof and we were officially dried in, although, we still didn’t have windows.   By fall we had started putting the logs up. We started on the front and went as far […]

Radiant Heat Barrier Inside

Radiant Heat Barrier Inside

Being in possession of  several large rolls of radiant heat barrier, we have researched all the possible ways to use it. It works for radiant heat, so there needs to be air space directly against the silver side for it to work as intended. It […]

Cabin – 5 Months Into Construction

Cabin – 5 Months Into Construction

We have made a lot of progress since September. Rain has kept us from working as much as we’d like, but hopefully we will be in by late summer. We’ll post pictures as we can until we catch up. Here is the end of day […]